Services
MCG MAJOR PROJECTS
Adnoc Projects through Third Party Companies
- TPIA Assignment for Tenaris Projects (PC-4, PC-5, PC-6, PC-7, PC-9, PC-10, PC-11,PC-12, PC-13, PC-14, PC-17,PC-20) for client ADNOC On shore for different countries such as UAE, China, Canada, Norway, Indonesia, Japan, Singapore, Mexico, Argentina, USA, Italy, Korea, Netherland, Brazil, KSA, Romania, Sweden etc.
- TPIA Assignment for Weatherford Projects for client ADNOC On shore for different countries such as India, UAE, Singapore, Indonesia, China, Norway, Netherland etc.
- TPIA Assignment for water Injection Pipeline for Habshan UPPER RECOVERY & LEKHWAIR + 20 (LK) PROJECTS for client ADNOC Offshore at KSA.
- TPIA Assignment for US LTDP-2 PROJECT for client ADNOC Offshore at India.
- TPIA Assignment for ESD UPGRADE PROJECT AT ZIRKU ISLAND project for client ADNOC ONSHORE at France.
- TPIA Assignment for ADNOC ONSHORE ONE-TIE-IN PROGRAM PACKAGE-13SWIC- 1&3 (PHASE-1) for client ADNOC On shore at various Vendor location at UAE.
- TPIA Assignment for Materials/ Equipment/Structures and Lifting Equipment (Local & Worldwide). Project for client ADNOC OFFSHORE at Norway.
Qatar Energy Projects
- TPIA Assignment for ongoing Project for client RAS LAFFAN PETROCHEMICALS, Qatar at USA.
- TPIA Assignment for ongoing Project for client RAS LAFFAN PETROCHEMICALS, Qatar at JAPAN. TPIA Assignment for Mobilization of HSE Officer at SAIPEM KARIMUN YARD at Indonesia for client Qatar gas.
- TPIA Assignment for Major Project – NFPS EPCOL for client Qatar gas at Indonesia.
- TPIA Assignment for Mobilization of Senior Painting and coating inspector for Berths & Loading at Vietnam for client Qatar gas.
- TPIA Assignment for Upgrade for MM & BH fields Wellhead Jackets and Real Time Data Transmission to Onshore project for client Qatar Energy at UK.
- TPIA Assignment for Engineering, procurement, Construction, and Installation of NFPS Project for client Qatar gas at UK.
BAPCO Projects
- TPIA Assignment for BAPCO MODERNIZATION PROGRAM (BMP) project for client TECHNIP ENERGIES at UAE.
KOC Projects
- TPIA Assignment for LM PRODUCT PIPELINES CAPACITIES & PUMP ADEQUACY BETWEEEN KNPC REFINERIES. Kuwait & LM DEPOTS for client Gulf Spic General Trading at UAE.
- TPIA Assignment for KNPC Projects, Kuwait for Client HEISCO at UAE.
- TPIA Assignment for WEST QURNA-1 OIL TRAINS 2 AND 3 (OT2&3) PROJECT, FIELD INSTRUMENTS
- TPIA Assignment for 11 PATTERNS WELL HOOKUP AND ASSOCIATED WORKS, NORTH KUWAIT
Other Projects
- TPIA Assignment for replacement OF 36” FLARE ACID GAS LINE -HABSHAN 1 (PHASE 2) /50178 project for client ISCCO at China.
- TPIA Assignment for ENI AgoGo for client Baker Hughes at UAE.
- TPIA Assignment for Agogo Integrated West Hub Development SPS for client Baker Hughes at South Africa.
- TPIA Assignment for TPI for GRE Pipes – Future Pipes Oman – GC20105600 / 4299. For client Rotary Engineering at Oman.
- TPIA Assignment for NFXP Offshore, Major Projects for client Qatar gas at Korea.
- TPIA Assignment for RLTO EXPANSION AND OFFPLOT FACILITIES OF THE NORTH FIELD EXPANSION PROJECT (EPC-3) for client VITO at China.
- TPIA Assignment for Engineering, procurement, Construction, and Installation of NFPS Project for client Qatargas at UK.
- TPIA Assignment QP Telemetry MM and BH RTU Replacement Project for client DOPET at Germany.
- TPIA Assignment for EPIC FOR TELEMETRY UPGRADE AT PS 2/3 project for client Qatar Petroleum at France.
- TPIA Assignment for EPIC FOR WHP-U08C TOPSIDE, PIPELINES, UMBILICAL & BROWNFIELD MODIFICATION AT PS1K (PHASE 5-1B) project for client SAIPEM at Germany.
- TPIA Assignment for ISND WHP-U08C Phase 5-18 Project for client SAIPEM at UK.
- TPIA Assignment for EPC for Provision PWT– PWRI 1 Project for client ROO at UAE.
- TPIA Assignment for Call off from CN102920 TMS DS01 ICCS Emerson Project No.: 0340RP for client ROO at UAE.
- TPIA Assignment for EPC for Provision PWT Phase 1 Facility Project for client ROO at France.
- TPIA Assignment for GTPP Expansion project for client LUKOIL for various vendor location at Turkey.
- TPIA Assignment for Inspection and Expediting for various projects for the client: ADNOC, PDO, WOOD, BGC, DESCON, CPECC, AGIBA, PEG, TECHNIP, Dhafir technology, BAPCO, TATWEER, ENPPI etc
- TPIA Assignment for Sulphur recovery well inspection and refurbishment project for client FMC at UAE.
- TPIA Assignment for Bahrain Alba PS5B4 Project for client TIEJUN International DMCC at UAE. · TPIA Assignment for SHI-PANAMA-HULL SN2315 project for client SHI at USA.
- TPIA Assignment for Red Sea Utility Assets and Infrastructure Project for client TIEJUN International DMCC at UAE.
- TPIA Audits for Drilling Rig Intake / JUIMS Compliance Audits for Rig AL JURF & Rig DANA for client ADNOC Offshore at CMHI Yard, CHINA.
- TPIA assignment for 3 X LM600PC Refurbishment Project at Corpus Christi, Texas, USA for client GE Vernova – Gas Power.
- TPIA assignment for Repair of Boiler and Auxiliaries at Doha East Power and Water Distillation Station, Kuwait project for client Heavy Engineering Industries & Shipbuilding Company, K.S.C (Public) at Japan.
MAJOR SYSTEMS HANDLED BY MCG
PROCESS UNIT | PRESSURE VESSELS |
---|---|
Fired Heaters, Furnaces Boilers, Cooling Towers, Incinerator WHRU, Cold Box | Vessels, Tanks Reactors, Towers, Heat Exchangers Air Fin Coolers, HRSG |
ROTATING MACHINERY | AC SYSTEMS |
Pumps Compressors, Fans / Blower/Roots Blower Gear Units, Cranes and Hoists, Conveyors (Belt, Chain, Bucket) Hydraulic Systems | HVAC Packages Air Conditioners Air Handling Unit |
PIPING MATERIALS | ELECTRICAL EQUIPMENT |
Process line pipes Tubes, Fittings, Fitting Flanges, Valves, Expansion joints, Bolt, Nut, Gasket, Steam / Air Traps, Strainer Silencer, Sample Cooler, GRE, FRP Pipes | Transformers, Switchgears and MCC, Motors, Generators, Reactors, Resistors, Illumination Fixtures, UPS, Batteries and Battery Charger, Construction Fitting and Materials, Construction Fitting and Materials DCS, Solar panels, FGDs system, I&C RT |
COMMUNICATION SYSTEM | INSTRUMENTATION |
Telephone Paging System General Paging System Audio Paging System Wireless Paging System Telephone System Direct phone, Inter Phone System, etc. | Transmitter Reaction Controller Metering System Position, RV, TG, PG, LG, LT |
MATERIALS | ENERGY |
Forging, Casting, Structural Steel, Fiber Glasses, GRE, GRP, FRP | Solar Energy PV, Power Plant PF |
WELDING & FABRICATION | SKID PACKAGES |
-PWPS preparation and PQR testing - WPS and welder qualification and training - Fit-up inspection, pre-heating and in process inspection - Full welding, surface preparation and coating - Pressure testing, reinstatement of works and welds - Work under Package and Field welders |
Chemical injection skid, CO2 analyzer skid, Well head control, metering skid, pump skids, water treatment skid, desalter skid, lube skid packages, Gas analyzer skid. |